Line Card

Structured Cabling Systems

•          Voice/Data/Project Cabling

•          CCTV Cabling

•          CATV Cabling

•          Audio/Video Cabling

•          Fiber to the Desk

•          CAT5e UTP

•          CAT6 UTP

•          Fiber Systems

•          Riser Systems

•          Coax

•          Cabling Troubleshooting

Technical Services

•          Data Center Design

•          Rack & Stack Network Equipment

•          Conduit Systems

•          Network Integration

•          Network Assessments

•          Moves, Adds & Changes

•          Testing & Certification

•          Network Infrastructure

•          Value Engineering

•          Site Surveys

•          Site Development

Wire and Cable

•          Access Control

•          Category

•          Coax

•          Fiber Optic

•          Fire Alarm

•          Multi Media

•          Security

•          Audio/Video

•          Connectors

Technology Components

•          Faceplate/Inserts

•          Patch Cords

•          Patch Panels

•          Distributed Audio

•          Automation

•          Intercom

•          Lighting Control

•          Camera Systems

•          Enclosures

Current Projects

The Killington Lodge (Killington, VT)
Working Knowledge contracted to upgrade all trelecommunication infrastructure at the georgeous Killngton Lodge in the foothills of the Green Mountains.

HANSA (Buffalo, NY)
Working Knowledge contracted by Uniland Development to provide, install and support all telecommunication technologies and infrastructure for new innovative shared office space and coworking center in downtown Buffalo. 

Midway State Park (Beemus Point, NY)
Working Knowledge contracted by New York State Parks, Recreation and Historic Preservation to provide a  complete fiber optic distribution system throughout the state park including direction drilling, boring, excavation, conduit installation and supplemental copper infrastructure at all end points.

Bryant & Stratton College (Buffalo, NY)
Working Knowledge subcontracted by large electrical contractor to provide all telecommunnication infrastructure (cabling and data center build-out) for the new downtown campus of Bryant & Stratton College.

Medina Central Schools (Medina, NY)
Working Knowledge awarded large contract to recable approximately1500 phone and data outlets at all three schools (Oak Orchard Elementary, Clifford H. Wise Middle School, Medina high School).  Project includes pathway development, supplemental wiring closet infrastructure, fiber optic remediation and manufacturer certifications

Buffalo Public Schools (Buffalo, NY)
Working Knowledge awarded a three year contract to upgrade, repair and replace all cabling thoughout the entire BPS network.  This is Working Knowledge's second time being awarded this contract.