![]()


Our team delivered a complete structured cabling solution for Oxbo’s new, 200,000 square foot manufacturing facility in Bergen, NY, supporting the company’s expanding operational and technology needs. The project included the installation of high‑performance CAT6 copper cabling and multimode fiber to ensure fast, reliable connectivity across the site. We built out both the MDF and multiple IDF locations, providing fully equipped, neatly organized, and scalable network distribution spaces. From backbone fiber runs to workstation drops, every component was installed to industry standards, tested, and certified to support Oxbo’s long‑term growth. Our team deployed and installed over 100 closed circuit tv devices, installed access control devices at roughly 50 doors, and installed hundreds of access points and speakers throughout the facilty.
Sustainability
|
Free Site Survey
|
Aspire of Western New York
InfoTech Niagara
Educational Technology Foundation
Temple Beth Zion
The Lancaster Opera House
USGBC
Families of FANA
Roswell Park Cancer Institute
Wounded Warriors
Lancaster Depew Soccer Club
Clarence Soccer Club
Junior Jerry Jam

Edwards Manufacturing Facility (Basom, NY)
Working Knowledge was awarded a contract to install all voice, data, audio/video and retail technologies at the newflagship retailer . Infrastructure included long haul, multi-mode fiber optic technologies, CAT6A copper to over 1,000 end-points and the complete build-out of all data center and wiring closet technologies. Installation also included overhead basket tray, comprehensive conduit work, smarts hands services including wireless access point installation and technical equipment rack-and-stack assistance.
Dicks House of Sport (Amherst, NY)
Working Knowledge provided a comprehensive structured cabling installation package for the new DICK’S House of Sport, delivering both copper and fiber infrastructure throughout the facility. Our team installed a high‑performance infrastructure solution to support the store’s voice and data technologies, interactive features, simulators, digital signage, audio video systems and operational systems. The result was a reliable, scalable cabling foundation built to handle current demands and future growth.
Erie 1 BOCES eSports Arena (Cheektowaga, NY)
Working Knowledge delivered a high‑quality structured cabling solution for the new BOCES eSports facility in Cheektowaga, NY, installing copper and fiber infrastructure that powers the facility's advaced technology and cutting‑edge educational and interactive learning environments. Our infrastructure provides for a fast, reliable network foundation that enhances the student experience and supports the facility’s growing technology needs.
Trico Redevelopment Project (Buffalo, NY)
Working Knowledge was hired as the low voltage consultant and primary low voltage integrator for the $80.5 million renovation of the long vacant Trico Products Corp. building into a mixed-use gateway project. Working Knowledge coordinated all vendors and aspects of the low voltage systems including security, access control, electrical, HVAC, circuiting, building controls and telecommunications. Working Knowledge was tasked with the design and implementation of a building-wide structured cabling package including all low voltage infrastructure to support wired and wireless technologies as well as the installation of distributed fiber optic technologies encompassing approximately twenty data closets throughout the building.
Major Data Center Upgrade @ Diversified Energy Organization (Williamsville, NY)
Working Knowledge contracted to install and upgrade fiber optic infrastruture in the data center of one of the largest utilities companies in the United States.
42MW Data Center Construction (Toyah, TX)
Working Knowledge was awarded the telecommunication construction contract for a new 42 megawatt data center project including pathway development (trenching and conduit), fiber optic installation and deployment, and copper connectivity to over 11,000 individual endpoints.